What if the work causes damage to my property?
The contractor will use appropriate care to ensure minimal disruption to the area necessary to complete the work, and is required to return the area as near as possible to it’s original condition. The contractor will also be taking “before” and “after” photos of each site. Impacted properties are encouraged to take their own pictures, with a time/date-stamp, of the area surrounding the meter box prior to work beginning.